Part 121 load manifest handoff guide for 2026: how late passenger, bag, cargo, tail and fuel changes reach the final loadsheet, with a field-level source map and acceptance-test matrix.
October 18, 2026• 30 min read
part 121 load manifest handoff14 cfr 121.665load manifest vs loadsheet